Below are photographs of an ICF home during construction.
Below is a picture showing all of the vertical steel reinforcing used inside the wall, there is also horizontal
rebar used which is not shown in this picture.
The picture below shows the polystyrene block laid 2 courses high around the perimeter of the home.
The 3 pictures below show the metal bracing on the floor of the house, which is used to support the
exterior wall before pouring concrete into the polystyrene blocks.
Below is a picture of a man spraying Iceyne insulation directly to the underside of the roof sheathing.